Description
Proposed Schedule (subject to the needs of the student).
1 RIIBEF201E Plan and organise work
2 RIICCM201E Carry out measurements and calculations
3 RIICCM203E Read and interpret plans and specifications
4 RIICOM201E Communicate in the workplace
5 RIISAM203E Use hand and power tools
6 RIISAM204E Operate small plant and equipment
7 RIIWHS201E Work safely and follow WHS policies and procedures
8 RIICCM202E Identify, locate and protect underground services
9 RIICCM205F Carry out manual excavation
10 RIICCM206E Support plant operations
11 RIICCM207E Spread and compact materials manually
12 RIICCM208E Carry out basic levelling
13 RIICRC201E Repair potholes
14 RIIRIS301E Apply risk management processes
15 RIICPL302E Install stormwater systems
16 RIIWMG203E Drain and dewater civil construction site
17 RIICRC301E Maintain drainage systems
18 RIIHAN308F Load and unload plant
19 CPCCSF2004 Place and fix reinforcement materials (pre-requisite unit is CPCCWHS2001)
20 RIIMPO320F Conduct civil excavator operations
21 RIIHAN309F Conduct telescopic materials handler operations
22 RIICRC306E Conduct earthworks
23 RIIHAN301E Operate elevating work platform
24 RIIMPO318F Conduct civil construction skid steer loader operations
25 RIIRIS201E Conduct local risk control